11 items found
Keywords: "1.13-287." (Contains)
Sorted by Title
Identifier Title Type Subject
ark:/16417/th746ctmh5bkqShots of plant under construction, early part of 1946. Shot of foundation being set. There is part of a crane in the foreground.
ark:/16417/th7fpkkj1w3l4Shots of plant under construction, early part of 1946. Shot of plant walls being erected.Image
ark:/16417/th71q8122blbkShots of plant under construction, early part of 1946. Shot of plant walls being erected.
ark:/16417/th71bhzv9p59pShots of plant under construction, early part of 1946. Shot of railroad tracks lining construction.
ark:/16417/th78l9fntv6xgShots of plant under construction, early part of 1946. The Leader published four pictures connected in a row of the General Electric Company plant while under construction. This is the first of the four shots. As the pictures show, foundations have been placed for a two-story office building and a one-story manufacturing plant of brick and reinforced steel at the north end of Chelan drive off of Rosemont Garden in the south of Lexington. The factory, designed to make sealed-beam auto headlights, will be 240 by 544 feet in size, the connecting office building, 45 by 120 feet. Shot of initial plant walls being built.
ark:/16417/th71gf1clvxsfShots of plant under construction, early part of 1946. The Leader published four pictures connected in a row of the General Electric Company plant while under construction. This is the fourth of the four shots. As the pictures show, foundations have been placed for a two-story office building and a one-story manufacturing plant of brick and reinforced steel at the north end of Chelan drive off of Rosemont Garden in the south of Lexington. The factory, designed to make sealed-beam auto headlights, will be 240 by 544 feet in size, the connecting office building, 45 by 120 feet. Shot of dirt mound inside foundation walls.
ark:/16417/th71h7ckl6p89Shots of plant under construction, early part of 1946. The Leader published four pictures connected in a row of the General Electric Company plant while under construction. This is the third of the four shots. As the pictures show, foundations have been placed for a two-story office building and a one-story manufacturing plant of brick and reinforced steel at the north end of Chelan drive off of Rosemont Garden in the south of Lexington. The factory, designed to make sealed-beam auto headlights, will be 240 by 544 feet in size, the connecting office building, 45 by 120 feet. Shot of construction, surrounding buildings.
ark:/16417/th7gdff55vvv0Shots of site of General Electric plant, off North Broadway between railway and Russell Cave pike. Shot of construction beginning.
ark:/16417/th7sx5d1gggqlShots of site of General Electric plant, off North Broadway between railway and Russell Cave pike. Shot of field with a car, buildings in background.
ark:/16417/th71lt45wl49tShots of site of General Electric plant, off North Broadway between railway and Russell Cave pike. Shot of foundation being set. There is a car on the construction site.
ark:/16417/th7thl60805lbShots of site of General Electric plant, off North Broadway between railway and Russell Cave pike. Shot of gutted field with several trees.